Kamis, 06 Oktober 2016
Jumat, 09 September 2016
Senin, 08 Agustus 2016
Senin, 10 Agustus 2015
Lombok Borepile Services
A Bored Pile is a no displacement form of foundation that is cast in
site and provides economical load bearing and walling solutions suited
to a wide range of ground conditions and applications.
Key advantages include.
• Able to carry very high load / shear / moment capacity • Low noise and vibration
• Ground is “seen” during construction allowing validation of design assumptions
• Can overcome adverse ground including natural or man made obstructions
• Can drill into hard rock
• Can be construct to tight tolerances
Tirta Mulia Engineering offers the following advantages for construction of Bore-piles:
• Wide range of drill rigs available (rotary, crane-mount, excavator mount, low headroom.
• Reliability of personnel, plant and equipment to provide a quality product
• A proven track record of experience and knowledge across all areas of Bali island, Lombok island and NTT island gained during more than 5 years of constructing bored piles
• Economical and productive methods of drilling in all ground conditions, from soft soils to very high strength rock;
• Extensive range of drill tools, casings and other auxiliary equipment suited to different drilling conditions that may be encountered.
Tirta Mulia Engineering is a Borpile and deep well specialist with adequate tools and experienced personnel.
Borpile foundation is one of the foundations on which type is used for the building, if the soils conditions are basically not have to bear the weight bearing capacity of the building.
Borpile with dry-drilling system:
Soil drilled using the drill spiral and land in the drill lifted each depth interval of 0.5 meters. This is done repeatedly until the specified depth. Drilling is carried out when the characteristics of the soil which was drilled inclined sandy soil and soft soil.
We, Tirta
Mulia Engineering services for building foundation work with bored pile methods. Support
by experienced personnel, good cooperation and a competitive price.
Key advantages include.
• Able to carry very high load / shear / moment capacity • Low noise and vibration
• Ground is “seen” during construction allowing validation of design assumptions
• Can overcome adverse ground including natural or man made obstructions
• Can drill into hard rock
• Can be construct to tight tolerances
Tirta Mulia Engineering offers the following advantages for construction of Bore-piles:
• Wide range of drill rigs available (rotary, crane-mount, excavator mount, low headroom.
• Reliability of personnel, plant and equipment to provide a quality product
• A proven track record of experience and knowledge across all areas of Bali island, Lombok island and NTT island gained during more than 5 years of constructing bored piles
• Economical and productive methods of drilling in all ground conditions, from soft soils to very high strength rock;
• Extensive range of drill tools, casings and other auxiliary equipment suited to different drilling conditions that may be encountered.
Tirta Mulia Engineering is a Borpile and deep well specialist with adequate tools and experienced personnel.
Borpile foundation is one of the foundations on which type is used for the building, if the soils conditions are basically not have to bear the weight bearing capacity of the building.
Bored pile is the
foundation on which works the same as pile foundation, the
difference is in the way of making
the foundation. Borpile
done by way of the
ground in a drill or in Make a holes first and then inserted
steel reinforcement already installed,
and then entered the
concrete or the local foundry.
Borpile services
working methods more or less as follows:
1. Determine the coordinates of the point and the midpoint of its pile cap Borpile along, using teodolit and water pass.
1. Determine the coordinates of the point and the midpoint of its pile cap Borpile along, using teodolit and water pass.
2. In determining the starting point of drilling in required to be in a
location that does not interfere with work material transport circulation.
3. Prepare and maintain drilling equipment close to the drilling location.
4. Plan groove drill tool movement to be efficient in time
5. There are two methods that are usually done to drilling that wet drilling
and dry drilling.
Borpile with dry-drilling system:
Soil drilled using the drill spiral and land in the drill lifted each depth interval of 0.5 meters. This is done repeatedly until the specified depth. Drilling is carried out when the characteristics of the soil which was drilled inclined sandy soil and soft soil.
Borpile with wash drilling system:
Soil eroded by using the drill bit cross. The Soil erosion assisted by blowing water through the handlebar holes drill with a centrifugal pump 3 ". This causes the ground to erode pushed out of the borehole. After reaching the planned depth, drilling is stopped, while the drill bit rotates left but the load suppression was stopped and the water circulation still continues until cutting or ground flake really lifted entirely. During this cleaning takes place, steel reinforcement and pipe tremi been prepared near the borehole. After a fairly clean, handlebar drill lifted from the borehole. After the drill holes clean the casting will be good results. Once the drilling work is completed inserted steel reinforcement already installed.
Casting is the last stage in the work Borpile services, foundry using tremi pipe so that the cast does not mix with mud and concrete results of a quality that is by tremi pipe inserted to the base of the borehole, when casting occurred tremi pipe moves up and down slowly, it is aims to mud pushed upwards by the surface of the concrete mixture.
Soil eroded by using the drill bit cross. The Soil erosion assisted by blowing water through the handlebar holes drill with a centrifugal pump 3 ". This causes the ground to erode pushed out of the borehole. After reaching the planned depth, drilling is stopped, while the drill bit rotates left but the load suppression was stopped and the water circulation still continues until cutting or ground flake really lifted entirely. During this cleaning takes place, steel reinforcement and pipe tremi been prepared near the borehole. After a fairly clean, handlebar drill lifted from the borehole. After the drill holes clean the casting will be good results. Once the drilling work is completed inserted steel reinforcement already installed.
Casting is the last stage in the work Borpile services, foundry using tremi pipe so that the cast does not mix with mud and concrete results of a quality that is by tremi pipe inserted to the base of the borehole, when casting occurred tremi pipe moves up and down slowly, it is aims to mud pushed upwards by the surface of the concrete mixture.
Diameter Borpile
we are doing is start from diameter 300 millimeter
Up to diameter 1200 millimeters and a depth of up to 30 meters.
Up to diameter 1200 millimeters and a depth of up to 30 meters.
Contact
us immediately
at Phone no.
081246436105, 085792708656 or BB 54777042. For
all the of your
building foundations needs, Hotel,
Villa, Retaining wall, bridge, etc